There are several methods to start a dynamic simulation later than at frame 1. However, using MASH, there are two elegant ways to wake up a "sleeping" dynamic node.
MASH and sleeping. Influence node and toggling the sleep parameter.
There are several methods to start a dynamic simulation later than at frame 1. However, using MASH, there are two elegant ways to wake up a "sleeping" dynamic node.
MASH and sleeping. Influence node and toggling the sleep parameter.
Got questions? Visit the Autodesk forums.